High-speed Railway New City of Yancheng Communications Holding Group

17.06.2022 05:06
Visits:958

High-speed Railway New City of Yancheng Communications Holding Group

Headquarters Building
  • Location

    Yancheng

  • Client

    Yancheng Yanxin High Speed Railway New City Urban Construction Development Co., Ltd.

  • Design

    Shanghai DuShe Construction Architects Co., Ltd.




A symmetrical layout along Century Avenue will be built into a new landmark building next to Yancheng high-speed railway station.

High-speed Railway New City





01

Project background



Yancheng High-speed Railway New City C7 is located in a high-end commercial complex, which consists of two 85m towers, two headquarters offices and supporting businesses. As the commanding heights of the high-speed rail group, C7 and the southern plot are not only landmark buildings beside Yancheng high-speed railway station, but also form a symmetrical layout along century avenue, becoming the gateway between Yancheng New City and Old City.





02

Design idea



C7 plot covers an area of 32,340㎡, with a floor area ratio of no more than 3.0 and a building height limit of 85m. The plot is separated by expressways, main roads, ramps and railways, and the urban interface is in disorder. In the scheme, according to the control conditions, the volume is formed, and the walking streamline and the south block will be built together, and the body block will be divided into two parts to form the central axis and the south block connecting axis. Two towers are set up in the south plot to form a complete urban interface, and a retreat is formed towards the inner courtyard. Maximize the enjoyment of the interior courtyard and improve the quality of office space. Create an experiential office space in the garden. Create three major products integrating headquarters office, tower office, urban public + community business.






03

Facade design



1.Tower


Tower facade system is divided into four categories, while facade control chart is divided into twelve detail drawing systems.


△Tower facade


△Detail drawing system of facade control chart


Detail drawing of T1 tower system T1 fold line wing: For the units of 7F or above, glass facade is applied, and for the units of 2~6F, frame glass wall is applied. With gradient wings, novel and unique in design.


△Standard joints of facade for units of 7F or above


△Standard joints of facade for units of 2~6F


△ Facade effect



T2 corner frame glass:


△Facade effect


The structure support is decorated with streamers (which are not fixed on the standing upright), and is covered with aluminum plates to form a canopy.




T3 tower system



In the standard section of the tower, with the help of T3 glass facade (unit type) + vertical metal components, the skirting line is optimized and the groove depth is compared.



△Facade effect


With facade gradient wing & cross-plate analysis, super-large plate research and stability strengthening system design of unit plate.




2. Podium


In the standard section of podium, the horizontal decorative strip is used to block the opening sash from the human perspective, in order to ensure the human visual height and transparent sight.



The opening sash should be the vertically dark bright frame, which makes the overall facade effect consistent, and the horizontal hidden frame should be used.



The design elements of gradient metal streamer in podium office make the building more smart. Three divisions have one streamer connection point to reduce the influence of components on architectural effect. Fine streamer straightening design and keel layout technology add luster to the completion of the building.





Glass facade (commercial)


Door head at main entrance: Q2 frame glass facade that is bright in horizontal direction and hiding in vertical direction is adopted for the commercial part.



Canopy: The canopy beam is above the glass, the glass surface is close to people, while the steel structure is blocked above, so the whole canopy is cleaner and tidy. The entrance of the lobby is designed with extremely narrow frame, and the operation of super-large glass plate increases the transparency.





Vertical glass louver


Customized vertical louver hardware components perfectly realize the ending connection of glass louver, which not only meets the architectural design intention, but also conforms to the safety facade design theme.




Special-shaped metal streamers


Emphasis is placed on the design of streamer-supported steel structure and the key areas of the project. After several rounds of argumentation, two poles are used at the position with small scale, and combination of three poles is used at the position with larger cantilever to control the bar scale, in order to achieve the best building effect.







Commercial platform:


Application of ceramic plate and rods: The design of the whole railing glass plate and the design of decorative ceramic rods close to the glass surface bring difficulties to the installation. Unique full-plate hanging scheme solved the landing problem of the solution. In addition, unit installation brings great guarantee to construction and installation accuracy.




Suspended glass box


The suspended glass box should be the ultra clear laminated & tempered glass to create a transparent feeling from the inside-out.